The Oyster Catcher Trench Works

The Oyster Catcher project was carried out in a Special area of Concservation (SAC) under strict ecological guidelines. The works related the diversion of an overhead cable to below the sand dunes at Rhosneigr beach. The works involved liaising with various local authority departments and ecologists.

The project demanded extensive planning and development and a method of turving was used to remove the ecologically sensitive flora for preservation and replace it after the works. All works were completed to the highest standards and the reinstatement was a massive success.

Dolgarrog Hydro-Electric Plant Upgrade
St. Angela’s National School
Menu